Diesel generators on UAE construction sites operate in conditions that accelerate every failure mode: high ambient temperature, fine abrasive dust, and continuous loading.
Oil and fluid management
Reduce oil change intervals from 250-hour to 200-hour schedule during UAE summer months. Check coolant level at the start of each shift.
Air intake and cooling system
Clean cooling fins weekly. Inspect and replace air filters every 50 hours during active construction phases with high dust levels.
Load management
Running a generator continuously above 80% of rated kVA shortens engine life. If your site load regularly exceeds this, size up. Stagger heavy equipment startups to manage motor starting surge.
Storage when not running
Cover air intakes when the generator is shut down in dusty conditions.